editorial · spring 2024
Reminiscence
A 6-page editorial for UTD Indigo Magazine's Reminiscence issue: a grungy, girly look back at a punk rock girl group.
- My role
- Graphic designer: all graphic elements and spread layouts
- Team
- Veena G. (photography), Minuki M. (writing)
- Editors-in-chief
- Bruno V., Keon O.
- Models
- Jamie L., Maserati C., Kayla L., Sreya I.
- Timeline
- 8 weeks; issue released May 2024
- Format · tool
- 6 pages, A4, magazine paper · Figma
Context
The issue's theme was “Reminiscence: boulevards of dreams and memories.” Our team answered it with Crimson Rose, a punk rock girl group looking back on its glory days. The challenge was to make three media, graphics, photos and writing, read as one story across three spreads.
Process
Research and moodboards. I worked from three layers of reference: the moodboard from Indigo's pitch meeting, a shared group moodboard and my own.
Designing by iteration. I don't sketch first; I keep moving elements in Figma until the composition fits. I dropped magazine cut-out letters: they added too much color, and once the palette narrowed to red and black they looked flat.
Type exploration. I tested handwritten faces including Sacramento, Passions Conflict, Just Me Again Down Here, Long Cang and Mr Dafoe, then chose Homemade Apple and paired it with Arial.
Shoot day. Veena shot in an on-campus apartment at UTD that we dressed to feel grungy and girly. The models had the palette ahead of time, and we brought extra props and accessories.
Feedback rounds. Review led to two changes:
- I cut the colors back to a monochrome red, black and white system, with pink as the only accent.
- I filled in and added white space to balance each composition.
Key decisions
- Contrast where it counts. Text readers need has high contrast with its background; other text works as texture and pattern.
- Red overlays for cohesion. They tie the photos into one palette and add color without pulling focus from the layout.
- Layers and drop shadows for depth. Stacked elements give the collage a physical feel, like keepsakes laid on a table.
Results
- 50
- people at the launch party
- 150
- copies printed and distributed
- 358
- website views (site no longer live)
- 2 wks
- issue run after the May 2024 release
“Feels like how I'd imagine a grungy girl rock band would look.”
“I like the collage. It looks really cool.”
What readers said.
Reflection
I now understand composition better, especially how to mix editorial and collage styles so a design feels personal without straying far from classic layout. I also learned how grids and spacing drive legibility.
With more time, I would rework the last spread. The idea was there, but the composition felt messier and less organized than the other two.